
Solid Waste Management Plant
Complete processing plants that convert mixed municipal solid waste into clean, recoverable fractions.
Turnkey plants, engineered around your waste
No two waste streams are alike. Moisture content, inert fraction, plastic share and seasonal variation all change what a plant needs to do — which is why we start every project with a characterisation of your actual waste rather than a catalogue layout.
From there we model the material flow, size each stage of separation, and design a line that hits your recovery targets at the throughput you need, within the footprint you have.

What a TDS Prime plant includes
A typical line combines feeding and pre-sorting, primary shredding, trommel screening, air density separation, magnetic and eddy current separation, secondary size reduction and baling — supported by conveyors, control panels and dust suppression.
Every machine in the line is built by us, so spares, service and future upgrades come from a single source.
Plant types we build
MRF — Materials Recovery Facility
Sorting and recovery lines that pull recyclables out of dry waste at high purity and consistent throughput.
RDF Processing Plant
Refuse-derived fuel lines producing a consistent, high-calorific fuel for cement kilns and industrial boilers.
Biomining & Legacy Waste
Mobile and fixed systems that reclaim old dumpsites and return land to productive use.
Compost Refining
Screening and refining lines that convert the organic fraction into clean, market-ready compost.
C&D Waste Processing
Construction and demolition waste lines recovering aggregate, sand and metal fractions.
Mobile Processing Units
Skid and trailer-mounted systems that can be relocated between sites as remediation work progresses.
Why a turnkey partner matters
- One accountable team from design through to commissioning and AMC.
- In-house manufacturing means faster lead times and genuine customisation.
- Spare parts available from the original manufacturer for the life of the plant.
- Layouts designed for maintenance access, not just for the drawing.
- Compliance with SWM Rules and CPCB norms built into the design brief.
- Operator training handed over with the plant so your team runs it confidently.
Let's come together to make cities clean, and farms green
Talk to our team about your waste processing requirement — we will get back to you within one working day.
