Skip to content
Excavator and dumper reclaiming a legacy waste dumpsite

Biomining Legacy Waste Management

Reclaiming decades-old dumpsites and returning valuable land to the city.

What biomining solves

Legacy dumpsites occupy prime urban land, contaminate groundwater through leachate, and generate methane and persistent fires. Capping them defers the problem; biomining removes it.

The process excavates aged waste, stabilises it through bioremediation, and mechanically separates it into soil-like fines, combustible RDF fraction, inerts and recoverable metals — leaving clean, reusable land behind.

Conveyor system positioned at a landfill ahead of mechanized processing

How the process works

Bioremediation comes first: the dump is dosed, aerated and turned over several weeks so that the organic content stabilises and moisture drops to a workable level.

Excavated material is then fed through a mobile screening train — typically a trommel screen followed by air density separation — producing a fines fraction suitable for site restoration, an RDF fraction with commercial value, and construction-grade inerts.

Our biomining capability

Mobile Trommel Screens

Trailer and track-mounted screens that move with the excavation face across the site.

Bioremediation Support

Dosing, windrow turning and aeration planning to stabilise waste before excavation.

Air Density Separators

Field-deployable separation of the light combustible fraction from inert material.

Fines Handling

Recovery of soil-like fines for site restoration, landscaping and landfill cover.

RDF Recovery

Capture of the combustible fraction as saleable refuse-derived fuel.

Site Planning & Execution

Excavation sequencing, equipment placement and throughput planning for the full remediation programme.

Outcomes of a biomining project

  • Prime urban land recovered for public or commercial use.
  • Leachate contamination of groundwater halted at source.
  • Elimination of methane build-up and recurring dumpsite fires.
  • Compliance with SWM Rules 2016 legacy waste remediation mandates.
  • Recovered RDF and metal fractions offset a share of project cost.
  • Measurable reduction in the site's environmental liability.

Let's come together to make cities clean, and farms green

Talk to our team about your waste processing requirement — we will get back to you within one working day.